Top Posts
Henry Kissinger, American diplomat and Nobel winner, dead...
Thai foreign minister fights back tears, welcomes Hamas...
Elon Musk curses out advertisers who left X...
China’s factory activity contracts for second month in...
Occupational Licensing Harms Workers in Similar Roles
Money laundering investigator warned of Hunter Biden’s ‘unusual,’...
California ‘refugees’ to bash Newsom at DeSantis press...
Hamas releases more Israeli hostages on 6th day...
Conservative lawmakers wary over slowdown in government funding...
GOP senators, House conservatives call for ‘fiscal sanity’...
  • About Us
  • Contacts
  • Privacy Policy
  • Terms and Conditions
  • Email Whitelisting
  • World News
  • Politics
  • Investing
  • Economy
  • Editor’s Pick
What Trader Talk
Editor's PickInvesting

Massive Cost Overrun on Renewable Energy Project

by November 15, 2023
November 15, 2023

Chris Edwards and Krit Chanwong

australia snowy project

Government infrastructure projects often go far over budget. Around the world, the costs of transit systems, energy developments, and other projects frequently soar above what was promised. One cause is the low‐​balling of initial cost projections to help secure public support.

A massive Australian energy project is an exemplar of runaway costs. The budget of the Snowy 2.0 power dam and energy storage project has exploded from $2 billion in 2017 to $12 billion today. The project is a reminder that taxpayers should be skeptical when governments propose large and complex construction schemes.

In the 1970s, Australia completed a system of 16 dams, seven power stations, and miles of tunnels called the Snowy Scheme. The project produces electricity and provides water for irrigated farming. It took 25 years to complete and cost $820 million, or about $8 billion in today’s Australian dollars.

In 2017, the Australian government announced Snowy 2.0, which will add tunnels, generation capacity, and large‐​scale power storage to the Snowy Scheme. Once completed, Snowy 2.0 is supposed to “provide an additional 2,200 megawatts of dispatchable, on‐​demand generating capacity and approximately 350,000 megawatt hours of large‐​scale storage to the National Electricity Market.”

The energy storage plan is to pump water uphill in periods of excess supply and then use the water to generate power when other supply sources—such as solar and wind—ebb. The project was “sold as a nation‐​building project for a low‐​carbon future.”

When Snowy 2.0 was announced in 2017, the government claimed it would cost $2 billion and be open in 2024. Government‐​owned Snowy Hydro pushed for approval saying it had completed “two years of rigorous due diligence.” But some experts warned at the time that the cost estimates were low‐​balled.

Over the years, the project has suffered major technical difficulties and delays. One of the project’s large tunneling machines advanced much slower than planned, created a giant sinkhole, and got stuck in soft ground for months.

Snowy Hydro announced in August 2023 that 2.0 would now cost $12 billion and be completed no earlier than 2028. If we add the costs needed to connect 2.0’s generation to the grid, the total cost could be $20 billion. An Australian dollar is about 65 cents of a US dollar.

a

Government dam projects are particularly prone to cost overruns. A 2014 study of 245 large dam projects found, “Large dams built in every region of the world suffer systematic cost overruns,” and the final costs of the sample projects “were on average 96% higher than estimated costs.” Snowy 2.0’s cost overrun of at least 500 percent is an extreme case but fits a common pattern.

Experts have questioned other aspects of Snowy 2.0 in addition to the soaring costs. Pumping water uphill for storage requires electric power from other sources, which in Australia includes large amounts of coal‐​fueled power. In the near term, Snowy 2.0 may increase the demand for coal‐​fueled power. Also, Snowy 2.0 will account for just a tiny fraction of Australia’s energy storage needs if the country were to fully transition to renewables. Furthermore, building vast infrastructure in a forest and re‐​plumbing river systems is not green. Finally, Australian regulators have sounded the alarm over Snowy’s monopoly power and rising electricity prices.

This critique of Snowy 2.0 focuses on the problems of large‐​scale energy projects. American policymakers would do well to heed the conclusion: “Given the pace of change, it would seem sensible to make the most of cheaper solutions which can be built quickly and don’t lock us in or out to technologies for the long term.”

previous post
Biden, Xi to meet on sidelines of APEC Conference in Bay Area: ‘Intense diplomacy’
next post
Breaking Down Taiwan’s Arms Backlog, Part 3: Comparing the Trump and Biden Administrations

Related Posts

Occupational Licensing Harms Workers in Similar Roles

November 30, 2023

Should Election Authorities Publish the Records of Individual...

November 29, 2023

A Fail-Safe Congressional Fiscal Commission to Fix Government...

November 29, 2023

St. Louis’ Little Trolley That Couldn’t

November 29, 2023

Junk Fees in Rental Housing Are a Distraction

November 28, 2023

New Zealand Does About-Face on Plans To Impose...

November 28, 2023

Signs of the Bright Future for Local News

November 28, 2023

AI Doesn’t Change the Economics of Labor, Capital,...

November 28, 2023

That’s Not How the BRAC Commission Worked: No...

November 28, 2023

New Defending Globalization Content: Trade, Consumption, Fashion, Technology,...

November 28, 2023
Join The Exclusive Subscription Today And Get Premium Articles For Free


Your information is secure and your privacy is protected. By opting in you agree to receive emails from us. Remember that you can opt-out any time, we hate spam too!

Recent Posts

  • Henry Kissinger, American diplomat and Nobel winner, dead at 100

    November 30, 2023
  • Thai foreign minister fights back tears, welcomes Hamas release of Thai workers

    November 30, 2023
  • Elon Musk curses out advertisers who left X over antisemitic content

    November 30, 2023
  • China’s factory activity contracts for second month in November

    November 30, 2023
  • Occupational Licensing Harms Workers in Similar Roles

    November 30, 2023
  • About Us
  • Contacts
  • Privacy Policy
  • Terms and Conditions
  • Email Whitelisting

Copyright © 2023 WhatTraderTalk.com All Rights Reserved.

What Trader Talk
  • World News
  • Politics
  • Investing
  • Economy
  • Editor’s Pick